Exceptional transport of a 55-tonne hydroelectric turbine

Planning and operational coordination of a night-time exceptional road transport for the energy sector, with tight bends, tunnels and narrow carriageways along the route.

Hydroelectric turbine on a modular semi-trailer during night-time exceptional transport

Sector

Energy · Power generation

Type

Exceptional transport

Load

Hydroelectric turbine, 55 tonnes

Mode

Night-time road transport

Objective of the operation

To move a large industrial component safely, protecting the infrastructure and ensuring operational continuity, while reducing interference and risks along the route.

Activities and operational responsibilities

  • Preliminary analysis of the transport and infrastructure interference
  • Planning of the route and operating windows
  • Operational coordination between all parties involved
  • Supervision of critical handling phases
  • Documentary support and checks on operational requirements

Operational challenges

  • Bends with a reduced turning radius
  • Tunnels with minimal side and vertical clearance
  • Road sections with limited carriageway width
  • Temporary removal of road signs
  • Controlled travel speed to ensure safety
Turbine on the semi-trailer during the transportExceptional convoy carrying the turbineManoeuvring of the turbine convoy along the route

Engineering approach and solutions

The TRESIA team carried out a detailed preliminary analysis of the route, checking geometry, gradients, available heights and infrastructure interference, in order to define a plan consistent with the existing constraints.

The operation was scheduled at night to reduce the impact on ordinary traffic, with coordination of technical escorts, support vehicles and safety activities along the route.

A modular semi-trailer suitable for special loads was used, with lashing systems designed to ensure stability and safety throughout all handling phases.

Outcome

The operation was completed on schedule and without interference with traffic or local activities. The component was delivered safely and is ready for installation in the hydroelectric plant.

TRESIA’s contribution

TRESIA supports industrial companies, EPC contractors and energy operators in managing complex transport and project cargo, combining engineering planning, operational coordination and control of critical phases. Read more about our exceptional transport and project logistics services, or see another case study: two industrial silos on the FI-PI-LI.

Planning a non-standard transport?

Our team can support you with technical analysis and operational planning.

Talk to the TRESIA team
Scroll to Top